| an AAA Affordable Contractors Company |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
| (713) 696-9400 |
||||||||||||||||||||||||||||||||||
| Office Locations |
||||||||||||||||||||||||||||||||||
| Concrete Prices Update |
||||||||||||||||||||||||||||||||||
| Decorative Concrete Parking Lots |
||||||||||||||||||||||||||||||||||
| Commercial Client Entrance |
||||||||||||||||||||||||||||||||||
| Architectural Flatwork |
||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
| Architectural Concrete |
||||||||||||||||||||||||||||||||||
Greetings and Welcome to ConcreteForever.Com © - Houston - Texas Commercial Division - (713)696-9400 Pier and Beam Foundations - Flatwork slabs & Retrofitting New Foundations - Existing Foundation Repairs - Raising and leveling QUALITY SERVICE call (713)696-9400 We are Custom Concrete Installers with State Certifications for Soil, Civil, Structural & topographical Engineering in Houston TX. We specialize in Residential, Commercial and light Industrial Concrete Foundations, Slabs, Piers and Architectural Concrete Construction with flatwork prices starting at just $1.62 per sq ft for frame, pour & Machine finishing on large Commercial Concrete parking lots, sidewalks, patios, tilt-up and general commercial concrete construction Projects. We provide Ready Mix Concrete Discounts when our installation crews install your concrete foundation or flatwork. Our 32 meter concrete pump assures fast and reliable pours Affordable Foundations with in house pier drilling, bellbottom, soil testing and engineering Turn-key foundations, tilt-up's and retro-fitting, laser screed, ride on power trowels, steel forms and fabrication services in Houston and south west Texas ConcreteForever.com © recommends that a minimum of 2-3 borings be performed at each project site. Past experience indicates that subsoils within a close proximity can vary significantly. The design soil parameters should be developed on the basis of weaker soil boring conditions to minimize potential foundation sediment displacement. The four corner piers of a foundation of a residential dwelling should be drilled first to establish the proper footing depth. The technician from ConcreteForever.com© recommends that a minimum of 2-3 borings be performed at each project site. The subgrade and fill soils under the floor slabs should be compacted to about minimum 95 percent of uniform compaction, density and thickness. All deleterious material shall be removed prior to concrete placement (ASTM D 698). Furthermore, the fill soils should be non-expansive. Atterberg limit tests should be performed on the fill soils, obtained from the borrow pit, to evaluate the suitability of these soils for use as structural fill and their shrink/swell potential. Field density tests should be conducted on the subgrade soils and any borrow fill materials in the floor slab and pavement areas by a technician from ConcreteFoundationContractors.com © . In the areas where expansive soils are present, about 24 to 48-inches of structural fill is placed under the floor slab areas. Laboratory proctor tests will also be performed on the on-site soils as well as off-site borrow fill materials to evaluate the moisture-density-sediment relationship of each of these soils analysis. Fill soils may have to be placed on the lots to raise the lot or to provide a buffer zone in between the on-site expansive soils and the floor slabs. We recommend that the required thickness of the fill be verified by a technician at concrete forever.com after the completion of the building pad. This task can be accomplished by drilling two borings to a depth of five-feet in the building pad area, examining and testing the soils to verify the fill thickness In the event that the structure is supported by drilled footings, we recommend that the installation of the footings be observed by a geotechnical technician from concreteforever.com. The four corner piers of a foundation of a residential dwelling should be drilled first to establish the proper footing depth. The technician will conduct hand penetrometer tests on the soil cuttings to estimate the bearing capacity of the soil at each footing location. He will make changes to the foundation depth and dimensions if obstacles, groundwater or soft soils are encountered. Therefore, minimizing costly construction delays. In addition, a technician from ConcreteFoundationContractors.com © will verify the bell size by a bell measurement device. Two sets of concrete cylinders (eight cylinders) will be made for each day of pour. Four cylinders will be broken at seven days, and four cylinders at 28 days The concrete sampling and testing in the floor slab and placement areas will be conducted in accordance with ASTM standards and the stringuent quality control at concreteforever.com- A technician from ConcreteFoundationContractors.com © will monitor batching and placing of the concrete. Twelve concrete cylinders will be made for each floor slab pour. Six concrete cylinders are tested at seven days and six cylinders at 28 days. The cost of performing quality control work will vary depending on project location and scope of work. We have estimated the required number of hours and testing requirements for the above-mentioned services. The details of our cost estimate are presented on Plate 1. In order to provide the most accurate estimate of the testing and inspection services, the actual construction schedules are necessary. The standard cost of testing and inspection services for this project ranges from 0.5 to 2.0% of the total new construction. Services will be billed monthly, with payment due on presentation. The team at ConcreteFoundationContractors.com © shall submit this document to the prospective home owner for approval. This will enable the builder to construct a better quality foundation system for the structure with much less liability exposure. Proper geotechnical and quality control studies for residential projects in the Houston metro area will result in a quality foundation system for residential structures installed by concreteforever.com - This will also significantly reduce potential liability problems to the owners/designers. In general, the cost of performing these studies are a minimal investment when compared to the total cost of the project and potential foundation repair costs We also can conduct hand penetrometer tests on the soil cuttings to estimate the bearing capacity of the soil at each footing location. He will make changes to the foundation depth and dimensions if obstacles, groundwater or soft soils are encountered. Therefore, minimizing costly construction delays. In addition, a technician from ConcreteFoundationContractors.com © will verify the bell size by a bell measurement device. Two sets of concrete cylinders (eight cylinders) will be made for each day of pour. Four cylinders will be broken at seven days, and four cylinders at 28 days The concrete sampling and testing in the floor slab and placement areas will be conducted in accordance with ASTM standards and the stringuent quality control at concreteforever.com- A technician from ConcreteFoundationContractors.com © will monitor batching and placing of the concrete. Twelve concrete cylinders will be made for each floor slab pour. Six concrete cylinders are tested at seven days and six cylinders at 28 days. The team at ConcreteForever.com © shall submit this document to the prospective home owner for approval. This will enable the builder to construct a better quality foundation system for the structure with much less liability exposure. Proper geotechnical and quality control studies for residential projects in the Houston metro area will result in a quality foundation system for residential structures installed by concreteforever.com - This will also significantly reduce potential liability problems to the owners/designers. In general, the cost of performing these studies are a minimal investment when compared to the total cost of the project and potential foundation repair costs |
||||||||||||||||||||||||||||||||||


